EAC designed the upgrade of the forced entry protection along with the upgrade of the lobby teller windows, mantraps and FE/BR protection for the existing generator facility at the U.S. Embassy at Port Louis, Mauritius.  A new mail sorting facility was also added on this project. New FE/BR doors and FE window protection were added throughout the facility.  

This task order was Design-Build project where EAC was the prime A/E.  This project also involved upgrading technical 
security services functions and upgrading HVAC systems.  

Project Type: Design-Build

Services Provided:

-Architectural
-Structural
-Technical Security Systems
-Electrical
-Mechanical
-Sprinkler & Fire Protection
-Plumbing
-Value Engineering


U.S. Embassy, Port Louis, Mauritius


   Back