Evaluation of the existing conditions and preparations of contract documents and cost estimates for upgrading biomedical and genetic research labs.  The project required that 70 degree F with 50% RH.  The design included central air handling system with heat recovery, primary humidifier and high efficient filters, constant volume boxes, secondary humidifiers and reheat coils and laminar flow type air terminals.  Critical air balance was incorporated.

 

Naval Research Lab Washington, DC


<
    Back