EAC was contracted as an A/E design team by the Design-Build Contractor (OES Inc.) to design the replacement of the following:

Post-1 Guard Booth with upgraded FE/BR doors/windows and the redesign to replace the interior counters/cabinets of Post-1. Post -1 was maintained by a temporary pre-fabricated guard booth while the construction of the main Post-1 was completed. All TSS wires, conduits and cables were reconfigured for both temporary and final Post-1.

Main Lobby Interior Glass Wall (North Side): Replaced third generation transom windows with new FE/BR windows.

Replace existing FE/BR doors in multiple locations at the rear emergency exit, Pouch Room, Mail Room, Ball Room/Kitchen and other designated locations.

Project Type: Design-Build

Services Provided:

-Architectural
-Structural
-Technical Security Systems
-Electrical
-Mechanical
-Sprinkler & Fire Protection
-Plumbing
-Value Engineering


U.S. Embassy, Manila, Philippines