EAC provided engineering services for replacing two main  3200 amp.  electric switchgears,  distribution feeder wiring throughout the building.  An extensive site survey was performed to determine the exact routing and termination of all the feeders and re-routing of feeders to with the new switchgear.  The project construction was carried out after normal business hours, so that the building could remain functional.  A temporary switchboard was designed so that all the active feeders from a switchgear could be temporarily fed from the temporary board.  The work was completed without any change orders or time delay.  The design was prepared in metric units using AutoCAD.

 

Hirshorn Museum and Sculpture Garden, Washington, D.C.


<
   