At the Defense Intelligent Agency, located in Washington, DC, EAC was commissioned to design and engineer the chilled water piping system to develope redundancy to the mission critical Data Center and to replace four Cooling Towers.

 

Cooling Tower, DIA, Washington, D.C.


<
    Back