FOUNDATION (at pouring of the foundation, but before the backfill): Our inspection ensures that the foundation is sitting on firm bearable ground and that the steel reinforcements are placed properly. 

PRE-DRYWALL
(Upon completion of framing, but before the dry-wall is installed): Ensures that the structural framing, electrical, plumbing, and ductwork are normal.

BEFORE CLOSING (Final Completion and Punch-
list, but before closing): To ensure that the completed construction is problem free. 

BUILDER WARRANTY INSPECTION
: After move-in, but prior to the end of the one (1) year warranty by the builder.
REMEMBER :  It is easier, cheaper, less disruptive and more convenient to identify and rectify construction deficiencies during the construction process of a building than it is when the building is already built and occupied.

As professional Engineers and Architects, our findings have strong legal standing in the court. We specialize in inspecting newly constructed buildings and monitoring buildings that are under construction.

We recommend 
inspections during each of the following four stages of construction:

Contact Us  to schedule an appointment. We inspect ALL 7 DAYS OF THE WEEK.